Things have really moved forward over the last week. It is amazing how quickly the brickies get started. Our builder thinks he may finish early so more pressure on me to get all my stuff done.
I have built the new wall between the dining room and the living room. This has allowed me to move (Partially) the kitchen into it's new location. (The kitchen in the picture is our old one and this will be moved into the utility room once we order our new kitchen) I have just put it there so we have running water. Also, it needed to be moved as the builder is talking about knocking the wall down into the new extension in a week or two. Here are some pictures for you to look at.
Looking into the garage from what will be our new living room,
We now have flooring in the extension area, Picture looking into our new kitchen diner area from our new living room. Wall with the door you can see will be knocked down so this will all be open plan,
Where the kitchen was still to move the wall units and fridge, where the Fridge is will be our new downstairs loo, I will try and put this up on Sunday.
New location for kitchen
New wall I have built wall with the rad on it will be knocked down and supported by an RSJ the is will increase the size of the living room by 3m2.
Another picture looking into the garage,
Looking at the single storey rear extension,
Our two new man holes!!
Our new back door entrance that will take you into the utility room, there will be a second door that will take you from the utility room to the garage.
That's all for now guys,
Garry Christine
Thursday 12 June 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Wow - looks like a huge project Garry!
you seem to be achieving a lot though, and I'm looking forward to seeing the house grow on here
Post a Comment